Projects / Building Blocks for the Future of Talkin Tarn

Building Blocks for the Future of Talkin Tarn

The aim of the project is to;
(Refurbish bird hide and install wind turbine to provide electricity supply) – already complete
Revamp large stretch of revetment to provide and protect the banks from further erosion and widen and resurface the slipway. Thus providing;
A secure frontage to the tarn allowing easy access for groups for water sports acivities and an improved appearance.
A more stable edge which will be less slippery and will not require replacing every few years.
Widen and resurface tarn-side path. Thus providing;
A 1.3 mile loop path that is largely level and dry and of a 1.5m width all around the edge of the tarn.
Good quality, accessible paths, which compliment the sites new accessible facilities.
Landscaping of Old Campsite. Thus providing;
An area for groups to stay overnight on site.
Reed transportation to create reed bed nesting area and blue-green algae prevention

EB Number

683022

Estimated Start

01/03/2007

Estimated Finish

01/04/2007

Postcode

CA8 1HN

Amount

49931.15

Object Type(s)

D