Projects / Action On Energy

Action On Energy

The aims of this project are:
– To slash the energy consumption and associated carbon emmissions of the Centre by installing modern high efficiency condensing gas boilers as part of an overall energy efficiency programme

– To reduce the risk of unplanned emergency closure of the Centre by replacing the 35 year old boilers with 2 modern efficient condensing gas boilers, connected in a duel header and controlled in such a way that failure of a single boiler will not result in closure of the Centre

– To demonstrate to our large user community the impact that energy-saving measures have on our energy bills and carbon emissions, so that by example, we encourage others to implement similar energy reduction measures in their own homes

– To safeguard the long-term future of the Centre as a community resource by cutting the running costs

– To increase community use of the building by improving temperature control and creating a more comfortable environment for a wide range of users.

EB Number

295989

Estimated Start

01/07/2015

Estimated Finish

01/08/2015

Postcode

KY1 1ET

Amount

48031.51

Object Type(s)

D

Find a Funder for Your Project.