Replacement of red shale courts by all weather court.
* The red shale and net post sockets will be removed.
* A geo-textile membrane and concrete edgings will be followed by layers of crushed stone to a depth of 200mm.
* 9 Column bases with draw pits and 115 linear metres of ducting for floodlighting.
* The fencing to two sides will be removed and replaced.
* New tennis post sockets will be set.
* New tennis posts will be supplied.
* A pervious layer of macadam will be laid.
* This will be followed by a cover of synthetic grass.
* The surface will be in filled with sand.

EB Number

314065

Estimated Start

01/04/2010

Estimated Finish

01/05/2010

Postcode

BB3 1JT

Amount

26000.00