Projects / Belltower Floor Repair Project.

Belltower Floor Repair Project.

An outbreak of dry rot was discovered in the bell tower floor in July 2009 which necessitated removal of the entire floor and sanitising of the nearby area in order to prevent a spread of the rot. It is planned to replace the entire floor with a limecrete floor which will prevent recurrence of any future damage of this nature.

EB Number

503230

Estimated Start

01/05/2010

Estimated Finish

01/07/2010

Postcode

DE72 2AZ

Amount

2000.00

Object Type(s)

E

Find a Funder for Your Project.