Projects / Boilton Wood Footpath Development

Boilton Wood Footpath Development

The steep section of footpath needs upgrading as the recent increase in usage has worn away the surface. The path forms a walking section of the Guild Wheel a cycleway stretching 22 miles around the City of Preston. We aim to upgrade the surface at four ware points by installing a pitched stone surface. To encourage cyclists to walk chicanes and signage will also be installed with the aim of slowing their decent down the slope.

EB Number

25077

Estimated Start

01/06/2014

Estimated Finish

01/09/2014

Postcode

PR5 0AG

Amount

16837.00

Object Type(s)

D

Find a Funder for Your Project.