Brandy Bottom – Stabilisation Final Phase

This programme of work is the final phase of the stabilization of the remains of the new
and old pits at Brandy Bottom. Work at the new pit: repairs to the flank wall; restoration
of the walls and roof of the ventilation tunnel; installation of draining works and flooring in
the winding slot and installation of brick capping to the walls of the horizontal engine
house. Works at the old pit: installation of a stone flagged floor in and outside the
Cornish Engine House; repair of the brick wall and installation of brick coping at the old
boiler house; rebuilding of the south elevation staircase and replacing the missing stone
facing at the south-west corner.

EB Number

681358

Estimated Start

01/12/2019

Estimated Finish

01/10/2021

Postcode

BS16 9NL

Amount

15000.00

Object Type(s)

E