Projects / Bratton Jubilee Hall Solar Panels

Bratton Jubilee Hall Solar Panels

To install a minimum of 20 solar panels, an inverter and a 10kWh battery.
The installation will allow for 100% power from the array from March to October and hopefully a reasonable proportion in the winter months. In future we will look to replace the gas boilers with a heat pump. The aims are to reduce our monthly energy bills and as importantly, to reduce the hall’s reliance on fossil fuels, and reduce the carbon footprint.

EB Number

860133

Estimated Start

01/09/2024

Estimated Finish

01/09/2025

Postcode

BA13 4RN

Amount

3000.00

Object Type(s)

D

Find a Funder for Your Project.