Church Internal Works and Red-ordering

Following re-roofing funded separately we plan to re arrange the interior by creating an plain, level, carpeted space at the rear of the church which would be more suitable for church and community use. We would also repair the two transept platforms and the vestry floor which are in poor condition, rewire the nave for more energy efficient lighting and redecorate the nave, chancel and south transept. The aged plaster would be made good with the lime-based plaster. The walls would be repainted in lime wash and stonework cleaned.

EB Number

108616

Estimated Start

01/09/2016

Estimated Finish

01/11/2016

Postcode

GL7 5RY

Amount

22700.00