Projects / Energy Efficiency at Randwick Village Hall

Energy Efficiency at Randwick Village Hall

To upgrade the thermal insulation properties of the building by installing double glazing and loft insulation. To install a central heating system powered by a ground source heat pump and photovoltaics. The existing building is very cold and uncomfortable and expensive to heat using overhead electric bar heaters. The micro genertion techonologies employed will ensure the building is carbon neutral and incure zero energy costs for the life of the instalation. This is expected to be a minimum of 25 years.

EB Number

443910

Estimated Start

01/07/2008

Estimated Finish

01/09/2008

Postcode

GL2 8DN

Amount

10000.00

Object Type(s)

D

Find a Funder for Your Project.