Projects / Extension to Front Elevation of WCLC

Extension to Front Elevation of WCLC

To build an extension to the front of the community centre, to reduce the heat loss to the centre which at present is conciderable. With under floor heating the whole of the building looses heat every time the main entry door is opened, and that is hundreds of times daily.
We have Playscool /creche five days a week 45+ daily, Ballet on Saturdays 60+ through the day .I have been informed by the heating engineer of BCBC that a hot air blower at floor level run off the under floor heating is required, and off setting the new entry doors. A WiFi Cafe will also be part of the extension for young people to interphase with the internet combining homework classes and conferencing with other schools

EB Number

272968

Estimated Start

01/07/2017

Estimated Finish

01/02/2018

Postcode

CF31 1SP

Amount

0.00

Object Type(s)

D