Projects / Fotheringhay Church – Building For The Future

Fotheringhay Church – Building For The Future

Two toilets will be installed in the Treasury (one with disabled access) sensitive to historic context; a trench arch drainage system will be laid; plumbing for running water will be provided; the entrance to an underground crypt excavated in 2000, will be diverted and stairs down adapted. This is necessary to maximise the limited space available in the Treasury to house 2 toilets which are needed to encourage larger audiences and more community events.

EB Number

341010

Estimated Start

01/11/2015

Estimated Finish

01/12/2016

Postcode

PE8 5HZ

Amount

28094.00

Object Type(s)

D

Find a Funder for Your Project.