Projects / Hexham Community Centre – Sustainable Future

Hexham Community Centre – Sustainable Future

The proposal is for 2 new, more efficient condensing gas boilers, window replacements and lift refurbishments. The current boilers are now 16 years old and are constantly breaking down. One is un-repairable and both need to be replaced as soon as possible. The Energy Audit revealed the very poor condition of the large single-glazed windows at the front (south) and west side of the building and highlighted the deteriorating state of the wooden frames.An annual inspection on the lift has brought up a need for the carriage to be brought up to current British Standards.

EB Number

503230

Estimated Start

01/08/2013

Estimated Finish

01/12/2014

Postcode

NE46 3NP

Amount

13267.00

Object Type(s)

D

Find a Funder for Your Project.