Projects / Installation of air conditioning, toilet refurbishment and lean-to storage extension

Installation of air conditioning, toilet refurbishment and lean-to storage extension

We aim to refurbish the Hilltop Community Centre to provide an upgraded facility that can remain fit for purpose. The Centre has served the local community for more than 30 years with 500 people accessing activities, services and social events every week, and has been run by WMCO since 1995 (23 years). During this time we have seen increasing usage, but the lack of any refurbishment has led to increasing wear of the facility – reducing our ability to engage more groups and residents in meeting their needs. It is in desperate need of refurbishment– as confirmed by our current and past users and the wider community following consultations and public meetings.

This project will be to refurbish the toilet facilities, improve the environment and air quality by installing air conditioning, and increasing the size of building by building a lean-to extension to fulfil the storage needs identified by the users.

EB Number

344133

Estimated Start

01/08/2018

Estimated Finish

01/03/2019

Postcode

HP11 1UA

Amount

95330.55

Object Type(s)

D