Projects / Installation of Pumped Foul Water Sewer System

Installation of Pumped Foul Water Sewer System

To pump foul water to the main sewerage manhole belonging to Severn Trent at the top of our ground. At present the sewerage is of the cesspit, by a tanker each week in the rugby season. The cesspit is filled from the showers (in use 6 times per week), the toilets, wash basins and sinks

EB Number

454217

Estimated Start

01/05/2006

Estimated Finish

01/05/2006

Postcode

WS5 3JP

Amount

23567.00

Object Type(s)

D

Find a Funder for Your Project.