Projects / Kinver Edge – Holy Austin Rock Houses Path Restoration Project

Kinver Edge – Holy Austin Rock Houses Path Restoration Project

Footpath 1 – requires remaking with engineering bicks and new concrete bed. Red and blue engineering bricks are required. Preparation of site will be assisted by the Kinver NT Volunteer Group.
Footpath 2 – new easy access path from car park to the brick path in front of the Rock Houses. To cope with incline it will snake for over 150 metres, will have wooden edges and a surface suitable for those usin either a sticks or a wheelchair. Preparation will be assisted by Kinver Volunteer Group

EB Number

673122

Estimated Start

01/07/2005

Estimated Finish

01/09/2005

Postcode

DY7 6DL

Amount

5354.45

Object Type(s)

D

Find a Funder for Your Project.