Projects / Main Church Path with New Pathside Drainage

Main Church Path with New Pathside Drainage

Due to the fact the main church access path is in a very dangerous condition, with the original stone slabs broken or badly cracked and lifting, which is a very bad tripping hazard, together with no pathway drainage, which after heavy rain fills, becomes temporarily flooded. Therefore by removing all the stone slabs and laying a complete new French type drainage system along the footpath and into the west side ditch and constructing the new pathway with concrete edging. Base of compacted scalpings and base coat of tarmac with non slip surface dressing.

EB Number

615238

Estimated Start

01/10/2010

Estimated Finish

01/12/2010

Postcode

SN15 5AD

Amount

3740.04

Object Type(s)

E

Find a Funder for Your Project.