Projects / Maximise field use through adequate drainage

Maximise field use through adequate drainage

Our aim is to install a drainage system at our Balshaw Park cricket ground that will allow greater use of the facilities we provide. The ground and facilities are available for use at all times and the only factor that prevents its use is flooding after periods of wet weather. There is no drainage currently and water tends to sit on the surface, installation of a drainage system would remove this excess water and allow use of the field for structured training sessions and the playing of games that would not previously have been possible.

EB Number

293073

Estimated Start

01/10/2011

Estimated Finish

01/11/2011

Postcode

PR7 6DD

Amount

23400.00

Object Type(s)

D

Find a Funder for Your Project.