Projects / Mitchell Building – Hydrogen ready boiler

Mitchell Building – Hydrogen ready boiler

Replacement of an aging and inefficient boiler that runs underfloor heating in our Mitchell Building extension. The project aim is to change the current system with one that isolates the boiler from the main flow and return any debris that could accumulate within the boiler itself. This will be achieved through the fitting of an external heat exchanger between the boiler and the underfloor system, and a filtering/cleaning system within the flow and return of the underfloor pipe work. The result will provide efficient heating and prolong the life of the boiler

EB Number

115077

Estimated Start

01/01/2025

Estimated Finish

01/03/2025

Postcode

BB4 5PG

Amount

5161.00

Object Type(s)

D

Find a Funder for Your Project.