Moira Village Hall Double Glazing

Following the recommendations of a recent Government energy audit the aim of the project is to reduce the running costs of the Village Hall, lower the carbon footprint of the building and reduce noise impact on neighbours by replacing existing ill fitting single glazed windows and doors with double glazing units. UPVC window frames will be galvanised steel reinforced doors will be green powder coated aluminium. Both heat retention and security will be improved. Window opening vents will feature a multi point shoot bolt locking system. Doors will have high security locks consisting of claw hooks, roller shoot bolts and dead bolts.

EB Number

562133

Estimated Start

01/06/2013

Estimated Finish

01/09/2013

Postcode

DE12 6DP

Amount

10000.00

Object Type(s)

D