Projects / New Theatre Roof

New Theatre Roof

Following three flooding events caused by torrential rain, our old asbestos roof and rain water drainage systems were not able to cope with the amount of water in a short period of time resulting in flooding into the theatre. With the roof and the drains being made of asbestos we are not allowed any modifications and a new roof is required with increased rainwater drainage capacity

EB Number

503230

Estimated Start

01/03/2014

Estimated Finish

01/04/2015

Postcode

NE8 4JS

Amount

22344.00

Object Type(s)

D

Find a Funder for Your Project.