Projects / Northmuir Hall, Kirriemuir – Heating System Upgrade

Northmuir Hall, Kirriemuir – Heating System Upgrade

To change the heating system at the hall from gas combi boilers heating water-filled radiators to eco friendly electric powered “e-RAD” infrared radiator panels. This system will provide an even distribution of radiant heat throughout the building, controlled by a smart control panel which can be fully automated at pre-set temperatures or adjusted to individual room requirements.

EB Number

122043

Estimated Start

01/03/2015

Estimated Finish

01/06/2015

Postcode

DD8 5BX

Amount

15954.40

Object Type(s)

D

Find a Funder for Your Project.