The aims of the project are two fold. 1) following government guidelines we intend to replace an existing gas boiler with an air to water heat pump to maintain hot water in the toilets and to radiators in the various meeting and kitchen rooms 2) introduction of an air ventilation system in the main sports hall to improve air flow throughout this space with regulated temperature control and cooling when appropriate in hot summer days etc.
An added benefit by removal of the gas boiler currently sited in the mens toilets will enable a restructuring of this area of toilets to include a disabled facility. This project will be funded by a separate grant.

EB Number

546416

Estimated Start

01/05/2022

Estimated Finish

01/03/2023

Postcode

BB2 7EW

Amount

30000.00

Object Type(s)

D