Phase 3 The Final Touches

To further develop our sustainable approach by:
1) Continuing to reduce our energy use by installing a second air to air heat pump, the first having proved very efficient and economical. Also install 16 solar PV panels and inverter plus a data display.
2) To replace the old worn out carpet and chipboard flooring with a modern, hygienic and easily cleaned surface.
3) Install built-in, lockable cupboards for safe storage of village hall archives and the historical village records which are being collected by the recently formed history group.
4) Install a low level sluice for cleaning purposes to provide safe disposal of contaminated cleaning water.

EB Number

146147

Estimated Start

01/03/2014

Estimated Finish

01/06/2015

Postcode

GL18 1JN

Amount

8462.00

Object Type(s)

D