Projects / Reducing our Carbon Footprint and Renovation

Reducing our Carbon Footprint and Renovation

By reducing our carbon footprint, we will reduce our energy usage which will enable the trustees to keep hire charges at a manageable level for everyone, which is important in the current financial climate.
Our project involves:
• Replacing the remaining 14 windows with UPVC Double Glazed units
• Replacing existing ceiling and replacing with a new ceiling to enable insulation to be installed
• Reconfigure the toilets to provide 3 able-bodied all gender toilets with their own wash basins.
• Create a new all-gender accessible toilet which will include baby changing
• Create a new much needed storage area
• Create a new door and corridor to link the Jubilee Room and Main Hall
• Re-wiring and installing new LED lighting
• New external entrance doors
• Renovation work to Parquet Floor
• Decoration

EB Number

113034

Estimated Start

01/07/2023

Estimated Finish

01/09/2023

Postcode

LS23 6AA

Amount

74834.60

Object Type(s)

D

Find a Funder for Your Project.