Replacement Heating System and Refurbishment of Toilet Facilities at Englefield Green Social Hall

This project seeks funding for the provision of a replacement heating and refurbishment of the toilet facilities at Englefield Green Social Hall; improving the energy efficiency of the building and the physical environment of the Hall for the benefit of all users.
Specifically work will include –
Removal and replacement of existing boiler with two high efficiency wall mounted units
Alterations to associated pipe work, gas supply and control system
Fitting of thermostatically controlled valves to all existing radiator units
Removal and replacement of all existing sanitary ware and associated plumbing works

EB Number

106185

Estimated Start

01/02/2007

Estimated Finish

01/05/2007

Postcode

KT16 9AG

Amount

39895.32

Object Type(s)

D