Projects / St Peter’s Church Wimblington

St Peter’s Church Wimblington

To install an automatic pump for the boiler room to St Peter’s Church in Wimblington to prevent flooding. This involves lifting floor slabs and creating a sump where the new submersible pump with water level switch will be installed. The project also includes electrical work to connect the pump to the rest of the church mains system via a new fused connection, pipework cut through the wall to connect the pump to an exterior drain, and remedial work to make good.

EB Number

535634

Estimated Start

01/12/2021

Estimated Finish

01/12/2023

Postcode

PE15 0QS

Amount

9750.47

Object Type(s)

E

Find a Funder for Your Project.