Stuart Memorial Hall Tempsford

The aim is to encourage greater use by new and existing users of the hall during the winter by completely replacing the central heating system with a new oil fired radiator based system with more control and therefore efficiency. The current heating system has radiators in the principal rooms only, and is not adequate in cold weather in the main hall. The boiler is at the end of its life and susceptible to breakdowns. The plan is to install a complete new system proving heat to all areas of the hall, or parts of it as necessary. It will also maintain a comfortable temperature. This would encourage greater use in cold weather.

EB Number

798210

Estimated Start

01/07/2005

Estimated Finish

01/07/2005

Postcode

IP1 4JP

Amount

19250.00

Object Type(s)

D