This phase of the centre is putting in place the next part of the overall design and preparing for the future. The lake will add to the diversity of the flora and fauna whilst adding a further dimension to the activities of the centre. This can be said of the quiet garden also giving people a secluded place to sit with a footpath to include both. At the same time we need to add the biodigester which will put in place a system that will make sure TRAC does not put any pressure on the infrastructure of the sewage and waterways locally. The capacity that is needed will look to the completion of the whole and the completion of the centre with everything that is planned.

EB Number

659057

Estimated Start

01/06/2010

Estimated Finish

01/01/2012

Postcode

GL18 1HE

Amount

0.00