Projects / Upwood Village Hall Roof Insulation Project

Upwood Village Hall Roof Insulation Project

Upwood Village Hall Roof Insulation Project. The work will involve removing the timber cladding from the hall ceiling and installing high efficiency foil-backed insulation board in its place. This will also require the installation of strengthening steel straps to cater for any increased roof loading as well as the installation of roof vents in the roof tiles in order to provide adequate ventilation above the insulation, thus reducing the danger of condensation.

EB Number

566176

Estimated Start

01/06/2014

Estimated Finish

01/11/2014

Postcode

PE26 2QE

Amount

14208.00

Object Type(s)

D